Sunday, December 22, 2024

Secret warnings were given about Rozelle traffic chaos three years ago. They were ignored

Must read

The spokesperson for Ward said the possibility of introducing a so-called tidal flow system would have been weighted against the long-term benefits of the Western Harbour Tunnel, which is due to open in 2028, and disruption to the Anzac Bridge.

Loading

Roads Minister John Graham said the Liberals had at least two years to warn Sydney to expect traffic jams, longer trip times and rat running through suburban streets in the inner west.

“Instead, they went to an election promising ‘traffic nirvana’, in one ex-minister’s words. The inner west was led to believe Victoria Road would be all bus lanes, bikes and fresh air,” he said.

“The NSW Labor government has always been brutally frank with the public about the challenge in balancing extra traffic induced by the Rozelle interchange.”

Transport for NSW’s document in February 2023 also warned of the risk that motorists’ trips would be 15 minutes longer and that “rat-running” would increase on two key streets in Annandale, as well as Parramatta Road. The delays for motorists turned out to be much longer after the interchange opened last November, especially along Victoria Road.

It also cited a 2017 environmental assessment predicting “significant queuing” on City West Link from congestion on the Anzac Bridge and Western Distributor without mitigations. In addition, it forecast queuing in the new Iron Cove Link tunnel and on an M4 motorway exit ramp.

More than two years earlier, a “sensitive” briefing document in November 2021 also warned that the interchange was forecast to increase traffic on the Anzac Bridge, and that without mitigations, would result in queues up to two kilometres long from the bridge and Western Distributor into WestConnex tunnels.

As it turned out, the queues extended along Victoria Road and City West Link while traffic out of WestConnex tunnels flowed relatively smoothly onto the bridge during morning peaks after the interchange opened last November.

The November 2021 document also warned of 15-minute delays for motorists bound for the CBD during the morning peak without mitigation measures.

Congestion caused on roads in Sydney’s inner west by the Rozelle interchange’s opening late last year.Credit: Sydney Morning Herald

The measures targeted to be completed by December 2023 when the interchange had been expected to be opened included ramp meters on roads approaching the Anzac Bridge. Other work was to install electronic signage on the bridge in a bid to improve traffic capacity.

Toll road operator Transurban recently told a parliamentary inquiry that it undertook high-level analysis of traffic “hotspots” and other likely impacts of the Rozelle interchange as far back as July 2022 and shared it with the previous Coalition government.

The opening of the WestConnex motorway interchange late last year caused severe congestion on roads in Rozelle, Balmain, Drummoyne, Lilyfield and Annandale as motorists struggled to navigate new routes, poor signage and multiple-lane merging.

Victoria Road and local streets in Drummoyne and Gladesville remain the worst affected by congestion. Changes to the sequencing of traffic lights to reduce congestion closer to the Balmain peninsula have caused vehicles to back up further west along Victoria Road in the morning peak.

Start the day with a summary of the day’s most important and interesting stories, analysis and insights. Sign up for our Morning Edition newsletter.

Latest article